Step By Step Guide

  • Call Our Team

    Step 1: Call Our Team

    Call our friendly and approachable team for a no-obligation chat to book your consultation at a time which suits you.
  • Initial Consultation

    Step 2: Initial Consultation

  • Plans drawn and building control approval

    Step 3: Plans drawn and building control approval

  • Quotation & Contracts Prepared

    Step 4: Quotation & Contracts Prepared

  • Site Survey

    Step 5: Site Survey

  • Clearing out the loft space

    Step 6: Clearing out the loft space

  • Floor joists are fitted

    Step 7: Floor joists are fitted

  • Insulating between floor joists and installing floorboards

    Step 8: Insulating between floor joists and installing floorboards

  • Fitting steel beams to reinforce rafters

    Step 9: Fitting steel beams to reinforce rafters

    The Building Control Officer is to inspect and pass these off to confirm they are in accordance with the approved plans.
  • Dormer construction if required

    Step 10: Dormer construction if required

  • Windows are fitted

    Step 11: Windows are fitted

  • Staircase is fitted, according to the specification on the plans

    Step 12: Staircase is fitted, according to the specification on the plans

  • Dormer is tiled to protect from the elements

    Step 13: Dormer is tiled to protect from the elements

    Scaffolding is erected for this.
  • Insulation is fitted between the ceiling rafters

    Step 14: Insulation is fitted between the ceiling rafters

    A gap of 50mm is left between roofing felt and insulation to provide adequate ventilation. 300mm thick Rockwool insulation is laid. The Building Control Officer will need to inspect and pass off this section of the work before we move on with covering this up with plasterboards.
  • Stud walls are erected to create the individual rooms as per the plans

    Step 15: Stud walls are erected to create the individual rooms as per the plans

    These are insulated as per the plans before being plasterboarded over.
  • First-Fix Electrics & Plumbing

    Step 16: First-Fix Electrics & Plumbing

    It is now time for our electricians and plumbers to step in and first-fix all the electrical wires and pipes, so that they are all snugly concealed behind the newly plaster-boarded walls.
  • First fix plumbing

    Step 17: First fix plumbing

  • Loft conversion is skimmed

    Step 18: Loft conversion is skimmed

  • Electrics second fix

    Step 19: Electrics second fix

  • Plumbing and electrics 2nd fix

    Step 20: Plumbing and electrics 2nd fix

    It is now time for the electricians and plumbers to return and fit the radiators and power points etc.
  • Finishing joinery

    Step 21: Finishing joinery

    It is now time for the joiners to come back and fit the skirting boards, architraves, doors, flooring, window boards etc.
  • Tiling of bathroom if required

    Step 22: Tiling of bathroom if required

  • Decoration

    Step 23: Decoration

  • Completion building inspection

    Step 24: Completion building inspection

  • Completion walkthrough

    Step 25: Completion walkthrough

  • After-sales service

    Step 26: After-sales service