0161 336 3366Call 7 days a week: 9am - 6pm

Gallery & Case Studies

Gee Cross Bathroom Suite Removal & Replacement

Completion date: January 2013

Completed from start to finish inside a week including all plumbing, electrics, tiling and plastering.

Read more

Stockport Full Bathroom Refurbishment

Completion date: January 2013

The clients, Mr & Mrs Edwards in Stockport had only recently moved into the property and brought us in to give him and the family the bathroom they had always wanted.

Read more

Wilmslow Bathroom Refurbishment

Completion date: December 2012

Finished off just in time for Christmas, Mr Robinson was delighted with the transformation and the speed with which the installation took place. The before and after images really illustrate the modern look we delivered.

Read more

Sale Bathroom Refurbishment

Completion date: August 2012

An interesting feature to note from this job is the highly sophisticated all-in-one toilet that Dr Singh requested as part of his bathroom refurbishment.

Read more

Stalybridge Full Bathroom Replacement

Completion date: July 2012

Completed inside just a week for Mrs Thompson in Stalybridge. The installation featured a wall-mounted pedestal and an electric towel radiator. Our top plumber Chris and his lads ensured everything was up to the normal exemplary Granada Home Improvements standards.

Read more

Glossop Bathroom Refurbishment

Completion date: November 2012

The client, Miss Woodward in Glossop, wanted a bathroom to give her real feeling of luxury, and the towel radiator and classy wall mounted pedestal with drawers certainly delivered that. The bathroom of your dreams is no more than a phone call away.

Read more

Request more info

Please enter your details below and we'll get back to you within 24 hours.

This is a captcha-picture. It is used to prevent mass-access by robots. (see: www.captcha.net)